KAIYUN's first domestic pure electric vehicle smart swap station, combined with the needs of related car companies to develop and manufacture smart car battery swap equipment, can replace the power battery of new energy vehicles within 3 minutes, solving the application bottleneck of long charging time for electric vehicles . The substation system has a complete technical architecture of cloud (intelligent switch management cloud platform)-side (edge computing server)-end (substation). It has a full range of power exchange equipment, charging cabinets, power distribution, station control, and cloud data platforms. The independent research and development strength of the components can fully meet the "replacement" needs of various customers.
At present, more than 300 units have been deployed in areas such as Beijing, Shanghai, and along the Beijing-Shanghai high-speed line. It is the most advanced power exchange system of its kind that has been put into commercial operation in the world.